一区二区三区高清av专区,起碰免费公开97在线视频,国产香线蕉手机视频在线观看 ,婷婷五月综合色中文字幕,国内精品久久久久电影院,久9视频这里只有精品,狠狠色噜噜狼狼狼色综合久,国产色视频网站免费
      Welcome: Ring of Beijing think-tank, environmental protection equipment co., LTD
      Language: Chinese ∷  English

      News

      Production Process of Carbonized wood outdoor chairs

      "Carbonized wood" gluing properties and surface finishing, good performance, and pine in the heat treatment process, turpentine basically volatile resin has cured, therefore, the resin ducts and Setsuko surface, do not do special sealing process can be directly do finishes. Carbonized wood outdoor chairs in use, it will not happen hot weather resin overflow, destroying the paint surface problems.

      Kiln and tank "carbonized wood" outdoor chair production process are divided into primary drying and secondary drying, charring rapid heating, cooling and conditioning treatment, and then cooling the kiln (tank) 5 phase.

      1 Primary Drying

      From birth (wet) wood dried to approximately 12% (or 10%) moisture phase is called once dry. This stage can be in the kiln carbonization (tank) carried, also accomplished by conventional kiln. Given carbonization kiln (tank) of the cost is higher, and the high cost of equipment operation, so using conventional drying kiln for a more economical, and the drying quality is also easier to control, but the drying time.

      (2) second drying

      From 12% dried to a wood moisture content of 3% (or 4%) of the second drying phase is called. This phase carbonization furnace (tank) to complete. Moisture content of about 12% of the timber into the carbonization kiln, the first transition can be conventional drying. Dry bulb temperature from about 65-75 ℃ Start, and then heated in stages to about 125 ℃, wet bulb temperature gradually expanded to 25 ℃. Subject wood moisture content to about 3%, the secondary drying stage ends. This phase of the length of time, depending on the wood species and thickness, 22mm thick timber normally takes more than 10 hours.

      3 rapid heating carbonization

      Wood moisture content of 3% after, they spent the dry dangerous period. Can quickly heat up, in a relatively short period of time, rising carbonization temperature (usually 180 ~ 212 ℃). Carbonization temperature then held constant for about 3 hours, high temperature heat treatment of wood, the wood of the hemicellulose and amorphous cellulose degradation, wood moisture greatly reduce the number of hydroxyl groups. Meanwhile in wood extractives such as resin, terpenoids, tannins, acids, a large number of objects containing volatile. Thus greatly reduced hygroscopicity of wood, dimensional stability and significantly improved corrosion resistance. This stage, the kiln (tank) to be filled within a protective gas (usually water vapor), oxygen gas must be less than 2%, a simple measure of the kiln to maintain the wet-bulb temperature of 99.5 ~ 100 ℃.Otherwise, there will be very dry wood fire hazard, and the wood under high temperature oxidation, its strength is also unfavorable.

      4 cooling humidity

      Wood carbonization treatment, not only the water content is very low (0.5%), and the wood itself, the temperature is high, close to 180 ~ 212 ℃. Then the humidity can not be directly processed must first timber to cool. Note do not use air cooling, if the kiln outside in the fresh air flow into the kiln, it is easy to make wood fire. The correct way is to stop the radiator heating while spraying atomized water to the kiln, not only play a role in cooling, but also make almost all dry timber proper humidification.Subject to the kiln medium temperature dropped about 116 ℃, humidity conditioning treatment can be carried out. Then the kiln while the saturated water vapor injection, and then atomized water spray in order to enhance the relative humidity of the kiln medium moisture content of wood, and to eliminate the residual stress. Wood moisture content generally be increased from 4 to 5%, to end the humidity treatment.


      CONTACT US

      Contact: Mr Chen

      Phone: 13521257486

      Tel: 010-82921102

      Email: zhitong_chenfei@163.com

      Add: Northwest of Beijing haidian district

      主站蜘蛛池模板: 日日躁狠狠躁| 久久不见久久见视频观看 | 亚洲欧洲日韩国内高清| 日韩av在线影院| 国产清纯白嫩初高中在线观看性色| 久久国产精品一国产精品| 在线成人看片黄a免费看| 就去吻综合| 黄色免费播放| 窝窝影院午夜看片| 欧美牲交a欧美牲交aⅴ免费| 看全色黄大色黄女片18| 十八禁国产精品一区二区| 乱码午夜-极品国产内射| 国产一卡2卡3卡四卡精品app| 国产美女久久久久| 国产一区在线播放无遮挡| 亚洲一区二区av在线观看| 欧美xxxx欧美精品| 国产一区亚洲| 国产av一区二区不卡| 少妇mm被擦出白浆液视频| 大粗鳮巴久久久久久久久| 亚洲热久久| 亚洲天堂网一区二区| 亚洲欧洲精品a片久久99| 日本一区二区a√成人片| 国产精品无套| 亚洲免费视频网| 久久97精品久久久久久久不卡| 国产一本一道久久香蕉| 少妇太爽了| 高清一区二区三区视频| 伦伦影院午夜理论片| 国产成人理论在线视频观看| 日韩三级视频在线观看| 美女xx网站| 漂亮人妻被黑人久久精品| 久久超碰精品一夜七次郎| 亚洲精品欧美| 日韩欧av|